What the assessment is
NIST SP 800-37 sets out the Risk Management Framework in seven steps: prepare, categorize, select, implement, assess, authorize, and monitor. The assess step asks whether the selected controls are implemented correctly, operating as intended, and meeting the system’s security and privacy requirements. That is the step we perform.
We assess against NIST SP 800-53 Revision 5 using the assessment procedures in NIST SP 800-53A. Each control is assessed with the methods the procedure calls for: examining documents, records, and configurations; interviewing the people responsible; and testing the mechanisms themselves.
How an assessment runs
- Assessment plan. We agree the system boundary, the baseline and tailoring, the methods and depth for each control, any controls inherited from common control providers, and the schedule. Fieldwork starts only once the plan is agreed.
- Fieldwork. We examine, interview, and test, remotely or on site depending on the system. Evidence requests are made in batches so your team can plan around them.
- Findings. Each assessment objective is recorded as satisfied or other than satisfied, with the evidence behind the result. Findings are discussed with the system owner as they arise, so nothing in the report is a surprise.
- Report. A draft security assessment report goes to the system owner for a factual accuracy review, then the final report is issued. How and when to remediate is the system owner’s decision, recorded in the plan of action and milestones.
What we need from you
- The system security plan, including the system boundary and the security categorization
- The selected and tailored control baseline, with any overlays and inherited controls identified
- Policies, procedures, and the evidence that the controls operate
- Access to the people who run the system and, for testing, to the system itself
- The current plan of action and milestones, if the system already has one
Who assesses
Assessments are led by assessors experienced in the Risk Management Framework. Nobody who designed, implemented, or documented the controls takes part in assessing them.